IME Logo
RWTH Logo

Research » Waste Treatment and Primary metallurgy

Title

Development of a energy efficient process through simultaneous melting of SiC-ceramics and WEEE for an optimised recovery of precious metals

Type

Verbundforschung

Sponsorship

VDI/VDE (ZIM-Förderung)

Duration

01.11.2019 – 31.10.2022

Partner

ReMetall AG – Deutschland

Description

Current pyrometallurgical recycling processes have encountered difficulties, as it is not possible to process batches containing more than 5% SiC ceramics – as in soot particle filters. Higher SiC contents would lead to an high viscosity of the melt, resulting in a lack of phase separation between slag and collector metal, making the process uneconomical. The collector metal is utilized to accumulate various precious metals from the ingredient scraps. The primary objective of the project is to increase the proportion of SiC ceramics in the feed mixture for the pyrometallurgical melting process in the electric arc furnace to 30-40%. The feed mixture to be developed will be briquetted for simplified charging and precise composition adjustment. The necessary aggregates must then be supplied with energy to accomplish the precious metal recovery. Through this new process, a considerably more efficient and thus more economical way of recycling soot particle filters will be developed. Treatment techniques will be further expanded and new markets will be opened up.

de_DEDE