Title

Optimising the Tantalum Recycling Process through Conditioning of Raw Materials, Process Automation and Material Logistics

Type

Verbundforschung

Sponsorship

EIT Raw Materials

Duration

01.04.17 – 31.03.20

Partner

H.C. Starck GmbH – Laufenburg, Institute of Plant Engineering and Fatigue Analysis, Department of Plant Planning and Material Logistics – TU Clausthal, Institute of Mineral and Waste Processing, Waste

Description

In this project, a pyrometallurgical tantalum and niobium recycling process has to be optimized. Aim of the project is to further develop the material pre-treatment, to allow the utilization of tantalum and niobium containing sludge and fines in an electric arc furnace. The implementation of enhanced material logistics is investigated, to decrease the production time in the plant. The automation of process steps in combination with online analytics will enhance the material recovery, the selectivity of the process and to decrease smelting times and therefore the energy consumption in the furnace.

de_DEDE